Skip to Main Content
Project checklist

Your creative journey, our guidance

Making Progress

It’s the moment everything comes together, and now that your flooring, walls, and cabinets are being installed you can finally set the date for installing your favorite countertop.

Things to Consider

  • Alert your cabinet maker to remeasure space before installation
  • Ensure your utilities fit in their allocated spaces, after flooring and cabinetry
  • Alert your general constructor or fabricator to take final measurements before templating
  • Verify that your fabricator placed the right order and received your countertop, before templating begins
  • Ask your fabricator for all your countertop registration details, so you can later activate your lifetime warranty

If you have a backsplash, install the countertop first and then mount your backsplash on the walls above it. Your plumbing and appliance connections should be put after your countertop is installed.

Tools

Find out all you need to know about your countertop

Learn how you can keep your countertop new and fresh